Georgia Department of Transportation projects to improve highway infrastructure throughout metro Atlanta continue this weekend, weather permitting. Construction on the I-285 northbound and southbound ramps to I-20 westbound and the Downtown connector will require lane closures, which, in turn, are likely to result in delays. Motorists are advised to exercise caution by reducing speed while driving through work zones.
The Georgia DOT encourages motorists to call 511, visit www.511ga.org or check the 511 Georgia and Atlanta Traffic app before departing for real-time information on work status and traffic conditions.
Planned work this weekend is as follows:
Northwest Corridor Express Lanes
· On I-75, one northbound lane will close just before and after Wade Green Road from 9 p.m., Friday until 5 a.m., Saturday.
· On I-75, two northbound lanes and one southbound lane will close between SR 280/Delk Road and SR 120 Loop/ South Marietta Parkway from 9 p.m., Friday until 5 a.m., Saturday.
· On I-75, one southbound lane will close between SR 120 Loop/ South Marietta Parkway and SR 280/ Delk Road from 9:30 a.m., until 4 p.m., Saturday.
· On I-75, one southbound lane will close just before and at SR 120 Loop/ North Marietta Parkway from 8 p.m., Friday until 5 a.m., Saturday.
· On I-75, two southbound lanes will close between Cumberland Boulevard and Windy Hill Road from 10 p.m., Friday until 5 a.m., Saturday.
· On I-75, one northbound lane will close between Cumberland Boulevard and the I-285 interchange from 9 p.m., Friday until 5 a.m., Saturday.
· On I-575, one northbound and one southbound lane will close between Barrett Parkway and the I-75 interchange from 8 p.m., Friday until 5 a.m., Saturday.
· On I-575, one lane will close on the northbound on-ramp from Chastain Road from 9:30 p.m., until 4 p.m., Saturday and Sunday.
· On I-575, the shoulder will close on the southbound on-ramp from Bells Ferry Road from 9:30 a.m. until 4 p.m., Saturday.
· On I-285, one lane will close on the eastbound on-ramp from Cobb Parkway from 9:30 p.m., until 4 p.m., Saturday.
South Metro Express Lanes
· On I-75, up to two northbound lanes will close between Jodeco Road/Flippen Road and Hudson Bridge Road from 9 p.m., Friday until 5 a.m., Saturday.
· On I-75, one southbound lane will close at Jonesboro Road from 9 p.m., Friday until 7 a.m., Saturday.
· On I-75, one northbound lane will close at Jonesboro Road from 9 p.m., Friday until 5 a.m., Saturday.
· On I-75, one northbound lane will close between SR 20/SR 81/Hampton Road and Jonesboro Road from 9 p.m., Friday until 7 a.m., Saturday. The lane closure will also take place from 7 a.m., until 5 p.m., Saturday and Sunday.
I-85 Express Lanes Extension
· On I-85, one northbound and one southbound lane will close just before and after the SR 20 interchange from 9 p.m., Friday until 5 a.m., Saturday.
· On I-985, one northbound lane will close from the I-85 interchange for 0.5 miles from 9 p.m., Friday until 5 a.m., Saturday.
I-285
· The I-285 northbound off-ramp to US 278/US 78/SR 8/Hollowell Parkway will close from 9 p.m., Friday until 5 a.m., Monday. Motorists traveling on I-285 northbound to US 278/US 78/SR 8/Hollowell Parkway can take I-20 westbound to SR 70/Fulton Industrial Boulevard; make a right on SR 70/Fulton Industrial Boulevard; continue on SR 70/ Fulton Industrial Boulevard to US 278/US 78/ SR 8/ Hollowell Parkway.
· The I-285 northbound and southbound ramps to I -20 westbound will close from 9 p.m., Sunday until 5 a.m., Monday and from 9 p.m., Monday until 5 a.m., Tuesday. Motorists traveling on I-285 northbound to I-20 westbound can take the US 278/US 78/SR 8/Hollowell Parkway; make a left off the exit; continue on US 278/US 78/SR 8/Hollowell Parkway to SR 70/Fulton Industrial Boulevard; make a left on SR 70/Fulton Industrial Boulevard; continue on SR 70/ Fulton Industrial Boulevard to I-20 westbound.
Motorists traveling on I-285 southbound to I-20 westbound can take the SR 139/Martin Luther King Jr. Drive exit; make a right off the exit; continue on SR 139/Martin Luther King Jr. Drive to SR 70/Fulton Industrial Boulevard; make a right on SR 70/Fulton Industrial Boulevard; continue on SR 70/ Fulton Industrial Boulevard to I-20 westbound.
· Two northbound and two southbound lanes will close just before and after Atlanta Road from 9 p.m., Friday until 5 a.m., Saturday.
· One northbound lane will close between Glenwood Road and the Indian Creek MARTA Station from 6 a.m., until 5 p.m., Saturday.
· The I-285 westbound collector-distributer lane to I-75 southbound in Clayton County will narrow to allow crews to repair the guardrail from 6 a.m., until 5 p.m., Saturday.
I-20
· All eastbound and westbound lanes will close at SR 42/Moreland Avenue from 6 a.m. until 8 a.m. Sunday to allow crews to pull utilities across the interstate. The work will require traffic paces. The traffic pace will require motorists to drive 5 mph -10 mph to allow contractors to work across the interstate lanes.
· Two westbound lanes and shoulder will close between the I-285 interchange and just after Thornton Road from 9 p.m., Friday until 5 a.m., Monday.
· Up to three eastbound lanes will close between Six Flags Parkway and SR 280/ H.E. Holmes from 9 p.m., Friday until 5 a.m., Monday.
· Crews will resurface the I-285 northbound and southbound ramp shoulders to I-20 eastbound from 4 a.m., until 6 p.m., Saturday. The ramp will remain open during the work.
I-75/I-85 (Downtown Connector)
· One lane will close on the I-75/I-85 northbound exit ramp to 10th Street, 14th Street, Georgia Tech (Exit #250) from 9 p.m., Friday until 8 a.m., Saturday.
· One lane will close on the I-75/I-85 northbound exit ramp to 17th Street (Exit #251A) and two northbound lanes and shoulder will close between University Avenue and SR 10/Freedom Parkway from 9 p.m., Sunday until 5 a.m., Monday.
I-75
· Two northbound lanes and shoulder will close at US 41/SR 3/Old Dixie Highway from 9 p.m., Friday until 9 a.m., Saturday.
I-85
· Two northbound lanes will close between SR 139/Riverdale Road and Virginia Avenue nightly from 9 p.m., until 5 a.m., starting Friday night until Monday morning.
Georgia (State Route) 400
· One northbound lane will close between SR 141/Peachtree Parkway and MacFarland Parkway continuously from 9 p.m., Friday until 12 p.m., Monday.
· The Georgia (State Route) 400 southbound on-ramp to the MARTA North Springs Station will partially close from 7 a.m., until 5 p.m., Saturday and Sunday.
Other State Routes
· On SR 8/Winder Highway one northbound and one southbound lane will close between Stanley Court and the Barrow County line from 9 p.m., Friday until 5 a.m., Saturday and from 9 p.m., Sunday until 5 a.m., Monday.
· On SR 3/ Northside Drive, all lanes will close between 10th Street and Marietta Street from 7:30 a.m., until 11 a.m., Saturday.
· On SR 9 / Alpharetta Street, there will be intermittent lane closures between Cherry Way and Norcross Street from 7 p.m., until 10 p.m., Friday.
· On SR 9/ Main Street, one lane will close between Academy Street and the Forsyth County line from 9 p.m., Sunday until 5 a.m., Monday.
· On SR 236/ Lavista Road, one southbound lane will close between I-285 and Briarcliff Road from 8 p.m., Sunday until 5 a.m., Monday.