Georgia Department of Transportation projects to improve highway infrastructure throughout metro Atlanta continue this weekend, weather permitting. Construction on the I-20, I-75 Express Lanes, and state routes will require lane closures, which, in turn, are likely to result in delays. Motorists are advised to exercise caution by reducing speed while driving through work zones.
The Georgia DOT encourages motorists to call 511, visit www.511ga.org or check the 511 Georgia and Atlanta Traffic app before departing for real-time information on work status and traffic conditions.
Planned work this weekend is as follows:
Northwest Corridor Express Lanes
· On I-75, one northbound lane and two southbound lanes will close between Windy Hill Road and Cumberland Boulevard nightly from 9 p.m., until 5 a.m., Friday night and Saturday night.
· On I-75, one southbound lane will close between SR 92/Alabama Road and Wade Green Road from 8 p.m., Friday until 5 a.m., Saturday.
· On I-75, a rolling closure will take place on the southbound lanes between SR 120 Loop/South Marietta Parkway and SR 280/Delk Road from 9 p.m., Friday until 5 a.m., Saturday.
· The I-75 southbound off-ramp to SR 120 Loop/ South Marietta Parkway will partially close from 8 p.m., Friday until 5 a.m., Saturday.
· On I-575, one southbound lane will close between the I-75 interchange and Barrett Parkway nightly from 8 p.m., until 5 a.m., Friday night and Saturday night.
· On I-575, one southbound lane will close between SR 92/Alabama Road and Bells Ferry Road nightly from 8 p.m., until 5 a.m., Friday night and Saturday night.
· On I-575, one northbound lane will close between SR 92/Alabama Road and Towne Lake Parkway nightly from 9 p.m., until 5 a.m., Friday night and Saturday night.
· One lane will close one the I-575 northbound on-ramp from Chastain Road from 9:30 a.m., until 4 p.m., Saturday.
South Metro Express Lanes
· On I-75, one southbound lane will close between the I-675 interchange and Hudson Bridge Road from 9 p.m., Friday until 7 a.m., Saturday.
· On I-75, one northbound lane will close between SR 20/SR 81/Hampton Road and Jonesboro Road from 9 p.m., Friday until 5 a.m., Saturday.
· On I-75, one southbound lane will close between SR 138/Lake Spivey Parkway and Hudson Bridge Road continuously from 9 p.m., Friday until 7 a.m., Monday.
· On I-75, one southbound lane will close between SR 20/SR 81/Hampton Road and SR 155 / N. McDonough Road from 7 a.m., until 5 p.m., Saturday.
· On I-675, one southbound lane will close between SR 138/Lake Spivey Parkway and SR 42/US 23/Macon Highway from 9 p.m., Friday until 7 a.m., Saturday.
· One lane will close on the I-75 southbound off-ramp to SR 20/SR 81/Hampton Road from 9 p.m., Sunday until 5 a.m., Monday.
· On SR 20/SR 81/ Hampton Road, one westbound lane will close at Willow Lane nightly from 9 p.m., until 5 a.m. starting Friday night until Monday morning.
I-20
· Up to three westbound lanes and a shoulder will close between Hill Street and the I-75/I-85 (Downtown Connector) interchange from 9 p.m., Friday until 12 p.m., Sunday.
· Three westbound lanes and the shoulder will close between the I-75/I-85 (Downtown Connector) interchange and Lee Street from 9 p.m., Friday until 12 p.m., Sunday.
· One westbound lane will close between SR 280/Hamilton E. Holmes Drive and the I-285 interchange continuously from 9 p.m., Friday until 5 a.m., Monday.
· The ramps from I-20 westbound and eastbound to I-75/I-85 (Downtown Connector) northbound and southbound will close to allow crews to pave the ramps. The ramp closures will take place between 9 p.m., Friday until 12 p.m., Sunday.
· One eastbound lane will close between SR 70/Fulton Industrial Boulevard to the I-285 interchange continuously from 9 p.m., Friday until 5 a.m., Monday.
· Two eastbound lanes will close between SR 139/ Martin Luther King Jr. Drive and the I-75/I-85 interchange (Downtown Connector) continuously from 9 p.m., Friday until 5 a.m., Monday.
I-285
· Two northbound and two southbound lanes will close just before and after Atlanta Road from 9 p.m., Friday until 12 p.m., Sunday.
Georgia (State Route) 400
· Two northbound and two southbound lanes will close just before and after the North Springs MARTA station exit from 7 a.m., Saturday until 7 p.m., Sunday.
· One northbound lane will close between SR 141/Peachtree Parkway and MacFarland Parkway continuously from 9 p.m., Friday until 12 p.m., Monday.
· Two northbound and two southbound lanes will close just before and after Encore Parkway from 9 p.m., Friday until 5 a.m., Saturday and from 9 p.m., Saturday until 5 p.m., Sunday.
Other State Routes
· On SR 42/Moreland Avenue, one northbound and one southbound lane will close between the I-285 interchange and Key Road for deep patching from 8 p.m., until 8 a.m., Saturday and from 8 p.m., Sunday until 5 a.m., Monday.
· On SR 141/Peachtree Industrial Boulevard, one northbound and one southbound lane will close between North Shallowford Road and Club Drive from 8 p.m., until 8 a.m., Saturday and Sunday and from 8 p.m., Sunday until 5 a.m., Monday.
· On SR 120/ Old Milton Parkway, one eastbound and one westbound lane will close between SR 9/ South Main Street and Brookhollow Trail from 8 p.m., Friday until 8 a.m., Saturday and from 8 p.m., Sunday until 5 a.m., Monday.
· On SR 92/Woodstock Road, rolling lane closures will take place between the Cobb County line and SR 9/ Alpharetta Highway from 8 p.m., until 8 a.m., Saturday and Sunday and from 8 p.m., Sunday until 5 a.m., Monday for striping.