Godfrey has
been the honorary chair of the playground committee since it began in
early 2000. He was then with Pathways communities, Peachtree City's prime
developer, and is now with Group VI. He is currently chairman of the Peachtree
City Development Authority and has served as president of the Fayette
County Chamber of Commerce.
"We are
very grateful to both of these well-known community leaders for accepting
our request to help us with our final phase," said Colleen Sugar,
who has been at the helm of the committee since its inception. "We
believe having their support will open doors and garner the support we
need to reach our goal."
The goal for
Phase III of the playground has changed significantly from its original
$100,000 to $50,000. The reduction has a practical purpose.
"We reduced
the budget for the final phase due to space constraints on site at Picnic
Park," said Randy Gaddo, the city's director of leisure services.
"The playground is taking up more space than we had originally envisioned,
so we are reducing the scope of the final phase."
Gaddo explained
that the final phase will consist of swings and a tot lot area for younger
children. It will contain the same rubberized surface as the rest of the
playground, and a ramp system that enables children of any physical ability
to play on the entire structure. He added that the reduction would also
retain more of a large grassed area between the playground and Lake Peachtree.
"That
open field is used by people for passive recreation, and we didn't want
to encroach any further than we have into it," Gaddo said.
The park has
become a very popular place for families and small community groups to
have picnics. It provides a scenic lakeside setting, has a picnic shelter,
electricity and of course, the playground. The city plans to run a water
line soon to add a fountain.
The All Children's
Playground was envisioned, designed and built to allow children of any
physical ability to get to every piece of play equipment. A system of
accessible ramps and bridges connects the entire structure. A special
rubberized surface allows wheelchairs or walkers to be easily used.
It was built
after local resident Colleen Sugar wrote a letter to the city's leisure
services director asking why the city didn't have any accessible playgrounds
for her physically challenged son, Jon, to play on. This led to the formation
of the Playground Committee under the Recreation Commission, with Colleen
as the chairperson. $100,000 was raised to build the first two phases
of the playground, and about $10,000 is raised so far towards Phase III.
Those interested
in making donations or in assisting in the final phase may contact the
Recreation Department at 770-631-2542 for further information.







Easy button Return it to long suffering taxpayers including those who have paid huge tabs to educate other people's kids…