With $65 million
in construction projects planned for the near future, parents and teachers
at the Jenkins Road school complex are disappointed that, once again,
an auditorium for the complex has been overlooked.
"We've
had ten years of fine arts programs that are educational, inspirational
and award-winning, but sadly most performances take place off campus,
and are not enjoyed by the other two-thirds of the school population,"
said Millie Turek, choral teacher at Sandy Creek High School, in a presentation
to the Board of Education Monday night.
She said the
complex needs a 600- to 700-seat auditorium for band, choral, theater
and dance performances and various school meetings. The complex includes
Sandy Creek, Flat Rock Middle School and Burch Elementary School.
When performances
are conducted in the schools' cafeterias, Turek said, students, parents
and teachers have to fold up all the tables, build their sets and backdrops,
perform and then return the cafeteria to its original state, all in the
space of one performance.
And the tables
and chairs are often a distraction from the atmosphere needed for a particular
play, choral or band performance, she said.
School groups
have performed in such venues as Carnegie Hall and Spivey Hall, she said,
and many of the students plan to go into performing as a profession, yet
must deal with decidedly unprofessional conditions when performing for
the home folks.
"It never
ceases to amaze me that despite all of these hardships the show goes on,"
said Karen Rossert, a parent who backed up Turek's presentation. She said
in one recent performance, a platform that dance students were using moved
six inches. Another time, she said, the sound system failed and the performance
had to be stopped while it was fixed.
Rossert also
presented statistics showing that students who participate in fine arts
have higher test scores and fewer discipline problems than those who don't.
About a third
of the 3,000 students who attend the complex are involved in fine arts
programs, said Turek, "and they deserve a gathering place where they
can experience the arts."
But they'll
have to wait awhile yet. Money for the auditorium was cut from the construction
project when the schools were built ten years ago, and it wasn't included
in the latest bond issue for new school construction and existing school
renovation, approved by voters this past November.
The auditorium
wasn't the only facility that was left out of the bond, said school Superintendent
Dr. John DeCotis. "Several issues came up," he said, adding
that the auditorium was included in a proposed sales tax for school construction,
but voters rejected the plan.
Needs such
as the auditorium will be considered as a staff committee sets priorities
and looks for funds in a ten-year plan for future construction, he said.
"We'll
have to fit it into that ten-year plan so we can see how funding will
come about," he said.
About 20 parents,
teachers and students attended the meeting to see what the board had to
say on the subject, and silently filed out following the response.







Easy button Return it to long suffering taxpayers including those who have paid huge tabs to educate other people's kids…