The signs are up "School
Bond, Vote Yes at End of Ballot" and supporters are out in force
at high school football games and school events circulating informational
fliers about the bond.
Fayette County voters will
vote yes or no on Tuesday for a $65 million bond issue for new school
construction. The package includes funding for three new elementary schools,
a new high school, and upgrades at older schools such as rewiring and
relighting, new ceilings, and improvements in kitchens and restrooms.
The bond will be enacted for
10 years if passed and will add to the school bond tax starting with the
2001 tax bill. A 10-year payback was decided upon since current bond indebtedness
was factored into the payback schedule.
According to Jim Stephens,
school finance director, this will keep the bond payments at a stable
level, while paying off the interest and principle on the other bonds.
"The maintenance and operation
millage was lowered for this year, which will result in a minimal tax
increase if the bond passes," Stephens said.
The need for new school construction
comes as a result of steady population growth in the county. School officials
report that there are 100 portable classrooms currently being used at
area schools and the system continues to add between 500 and 700 students
per year.
The Governor's A+ Reform Act
mandates school systems to lower class size, which puts an additional
burden on already overtaxed school facilities.
A recent town hall meeting
addressed several questions which voters have concerning the bond, such
as where the schools would be located.
Mike Satterfield, facilities
director for the school system, said the schools would be built in the
areas experiencing the most growth.
One elementary school would
likely be located along the Ga. Highway 74 corridor, another in the West
Village section of Peachtree City and a third probably between Fayetteville
and Brooks. The new high school would be situated somewhere south of Fayetteville,
Satterfield suggested.
No land has been purchased
being sought.
As for easing overcrowding
until the schools are built, the first choice of the facilities advisory
committee which has tackled the growth issue for months is more portables.
The second alternative would be to redraw school district lines, sending
students to schools less crowded facilities, therefore maximizing the
use of existing classroom space.
Double or split sessions ranked
lower on the list of options, with the least palatable being a trimester
system.
If the bond passes, construction
may begin as early as spring 2001 for the elementary schools, since a
prototype school exists and can be easily adjusted to fit a building site
and the specific needs of the school population. However, land must first
be acquired.
Sam Burch and Trina Berry,
cochairmen of the Community Coalition for Fayette Schools, are upbeat
and optimistic about the passage of the bond. Their one concern is that
voters stick with the lengthy general election ballot and work their way
down to the last item, which is the bond question.
"They've got to stick
with it," Burch said.







Easy button Return it to long suffering taxpayers including those who have paid huge tabs to educate other people's kids…