This weekend’s lane closures

0
50

Georgia Department of Transportation projects to improve highway infrastructure throughout metro Atlanta continue this weekend, weather permitting. Construction on the I-75/I-85 (Downtown Connector), South Metro Express Lanes, and Northwest Corridor will require lane closures, which, in turn, are likely to result in delays. Motorists are advised to exercise caution by reducing speed while driving through work zones.

The Georgia DOT encourages motorists to call 511, visit 511ga.org or check the 511 Georgia and Atlanta Traffic app before departing for real-time information on work status and traffic conditions. Motorists can also use the WAZE application turn-by-turn directions that consider current traffic conditions. Motorists are advised to drive alert and use both applications when they are not operating a vehicle.

Planned work this weekend is as follows:

Northwest Corridor Express Lanes

·         On I-575, one northbound lane will close between Towne Lake Parkway and Ridgewalk Parkway from 9 p.m., Friday until 5 a.m., Saturday.

·         On I-575, one northbound lane will close between Bells Ferry Road and Shallowford Road from 9 p.m., Friday until 5 a.m., Saturday.

·         On I-75, two southbound lanes will close between SR 120 Loop/ South Marietta Parkway and SR 280/ Delk Road from 9 p.m., until 5 a.m., Friday night and Saturday night.

·         On I-75, a traffic pace will take place on all northbound lanes between Chastain Road and Wade Green Road from 11 p.m., Friday until 3 a.m., Saturday. The traffic pace will require motorists to drive 5 mph -10 mph to allow contractors to work across the interstate lanes.

·         On I-75, a traffic pace will take place on all southbound lanes between SR 92/Alabama Road and Wade Green Road from 11 p.m., Friday until 3 a.m., Saturday. The traffic pace will require motorists to drive 5 mph -10 mph to allow contractors to work across the interstate lanes.

·         On I-285, one eastbound lane will close between Cobb Parkway and the I-285 eastbound collector-distributer lanes from 9:30 a.m., until 4 p.m., Saturday.

·         On I-285, one westbound lane will close between the I-75 interchange and Cumberland Boulevard from 9 p.m., until 5 a.m., Friday night and Saturday night.

·         On I-285, a traffic pace will take place on all eastbound lanes between Cobb Parkway and the I-75 interchange from 11 p.m., Friday until 3 a.m., Saturday. The traffic pace will require motorists to drive 5 mph -10 mph to allow contractors to work across the interstate lanes.

·         On SR 120 Loop/ South Marietta Parkway, one lane will close between the I-75 interchange and Franklin Gateway from 9:30 a.m., until 4 p.m., Saturday and from 9 p.m., Sunday until 5 a.m., Monday.

·         On Hickory Grove Road, a flagging operation will take place from Shiloh Road to Hamby Road from 7 p.m., until 5 a.m., Friday and Saturday.

South Metro Express Lanes

·         On I-75, up to two southbound lanes will close between the I-675 interchange and SR 155/ N. McDonough Road continuously from 9 p.m., Friday until 7 a.m., Monday.

·         On I-75, one northbound lane will close between Hudson Bridge Road and the I-675 interchange from 6 a.m., until 2 p.m., Saturday.

I-285

·         The I-285 northbound and southbound on and off ramps to and from US 278/US 78/SR 8/Hollowell Parkway will close from 9 p.m., Friday until 5 a.m., Monday. Motorists traveling on US 278/US 78/SR 8/Hollowell Parkway to I-285 can turn onto SR 70/Fulton Industrial Boulevard; continue on SR 70/Fulton Industrial Boulevard to I-20 eastbound; continue on I-20 eastbound to I-285.

I-20

·         Two eastbound lanes and shoulder will close between SR 70/Fulton Industrial Boulevard and the I-75/I-85 interchange from 9 p.m., Friday until 5 a.m., Monday.

·         A partial closure will take place on the I-20 eastbound ramp to I-75/I-85 southbound from 9 p.m., Friday until 10 a.m., Saturday.

·         Resurfacing will take place on the I-20 westbound ramp to I-75/I-85 southbound from midnight on Saturday until 8 a.m., Saturday.

·         One westbound lane will close between the I-285 interchange and SR 70/Fulton Industrial Boulevard from 9 p.m., Friday until 2 a.m., Saturday.

·         The I-20 westbound exit ramp to Liberty Road will close and one westbound lane will close at Liberty Road from 9 p.m., Friday until 5 a.m., Monday for concrete rehabilitation.

I-85

·         Two southbound lanes will close at Virginia Avenue from 9 p.m., Friday until 5 a.m., Monday.

·         One northbound and one southbound lane will close between the I-75 interchange and the I-285 interchange nightly from 9 p.m., until 5 a.m., starting Friday night until Monday morning.

I-75

·         Two lanes will close on the I-75 southbound on-ramp at Cumberland Boulevard from 7 a.m., until 2 p.m., Sunday.

·         Two northbound lanes and shoulder will close between the I-285 interchange and SR 54/Jonesboro Road from 9 p.m., Friday until 7 a.m., Saturday.

·         Two northbound and two southbound lanes and shoulder will close between the I-285 interchange and SR 54/Jonesboro Road from 7 a.m., Saturday until 7 p.m., Sunday.

·         Two southbound lanes and shoulder will close between the I-285 interchange and SR 54/Jonesboro Road from 7 a.m., until 7 p.m. Sunday.

·         Two northbound lanes and shoulder will close between the I-285 interchange and SR 54/Jonesboro Road from 7 p.m., Sunday until 5 a.m., Monday.

I-75/I-85 (Downtown Connector)

·         Five northbound lanes and shoulder will close between 10th Street and the Brookwood Interchange from 10 p.m., Friday until 9 a.m., Saturday; 10 p.m., Saturday until 9 a.m., Sunday. The I-75 northbound traffic will use the I-75 northbound HOV exit lane.

·         Five southbound lanes and shoulder will close between the Brookwood Interchange and 10th Street 10 p.m., Saturday until 9 a.m., Sunday; 10 p.m., Sunday until 5 a.m., Monday. The I-75/I-85 southbound traffic will use the I-75/I-85 southbound HOV exit lane.

I-285

·         The ramp from Windy Hill Road to I-285 westbound will close from 9 p.m., Friday until 5 a.m., Saturday.

·         Two eastbound lanes will close at SR 155/ Flat Shoals Parkway from 9 p.m., Friday until 9 a.m., Saturday.

Georgia (State Route) 400

·         One northbound and one southbound lane will close at the MARTA North Springs Station from 7 a.m., until noon Saturday.

·         One northbound lane will close between MacFarland Road and SR 20/Buford Highway from 9 p.m., Saturday until 12 p.m., Monday.

Other State Routes

·         On SR 13/ Buford Highway, two lanes will close between Corporate Boulevard and Central Avenue from 6:45 a.m. until 10:30 a.m., Sunday.

·         On SR 155/ Flat Shoals Parkway, two lanes will close between Woodberry Parkway and Snapfinger Road from 9 a.m., until 11 a.m., Saturday.

·         On SR 10/Memorial Drive, one lane will close between Loomis Avenue and Woods Street from 9 a.m., until 3 p.m., Saturday and Sunday.

·         US 29/SR 14/SW Broad Street will close between SR 92 and Smith Street from 7:30 a.m., until noon, Saturday.

·         SR 372/ Crabapple Road will close between Itaska Walk and Mayfield Road from 6:45 p.m., Friday until 9: 30 p.m., Saturday.

·         On SR 9/ Roswell Road, one lane will close between Canton road and Magnolia Street from 11 a.m., until 5:30 p.m. Sunday.

·         On Riverside Drive, one lane will close between Cold Stream Court and Fair Oaks Manor Drive from 8 p.m., Sunday until 5 a.m., Monday.

·         On SR 155, one lane will close from the Griffin City limits to US 41/US 19 from 9 p.m., until 5 a.m., starting Friday night.

·         On SR 236/ Hugh Howell Road, one lane will close between US 78 and SR 8/Lawrenceville Highway from 8 p.m., Sunday until 5 a.m., Monday.