This weekend’s lane closures

0
64

Georgia Department of Transportation projects to improve highway infrastructure throughout metro Atlanta continue this weekend, weather permitting. Construction on the I-20, I-75, and the Express Lanes will require lane closures, which, in turn, are likely to result in delays. Motorists are advised to exercise caution by reducing speed while driving through work zones.

The Georgia DOT encourages motorists to call 511, visit www. 511ga.org or check the 511 Georgia and Atlanta Traffic app before departing for real-time information on work status and traffic conditions.

Planned work this weekend is as follows:

Northwest Corridor Express Lanes

·         On I-75, the southbound off-ramp to SR 120 Loop/South Marietta Parkway will partially close from 8 p.m., Friday until 5 a.m., Saturday.

·         On I-75, a rolling lane closure will take place between  SR 120 Loop/South Marietta Parkway and SR 280/Delk Road from 9 p.m., Friday until 5 a.m., Saturday.

·         On I-575, one northbound lane will close between SR 92/Alabama Road and Towne Lake Parkway from 9 p.m., Friday until 5 a.m., Saturday.

·         Two lanes will close on the I-285 westbound collector-distributer lanes between Powers Ferry Road and Cumberland Boulevard from 9 p.m., Friday until 5 a.m., Saturday.

·         On I-285, a traffic pace will take place on all westbound lanes between Northside Drive and Cumberland Boulevard from 11 p.m., Friday until 2 a.m., Saturday. The traffic pace will require motorists to drive 5 mph -10 mph to allow contractors to work across the interstate lanes.

South Metro Express Lanes

·         On I-75, one southbound lane will close between SR 138/Lake Spivey Parkway and Hudson Bridge Road continuously from 9 p.m., Friday until 7 a.m., Monday.

·         On I-75, one northbound lane will close between SR 155 / N. McDonough Road and SR 20/SR 81/Hampton Road from 9 p.m., Sunday until 5 a.m., Monday.

·         One lane will close on the I-75 southbound off-ramp to SR 20/SR 81/Hampton Road from 9 p.m., Sunday until 5 a.m., Monday.

·         On SR 20/SR 81/ Hampton Road, one westbound lane will close at Willow Lane nightly from 9 p.m., until 5 a.m. starting Friday night until Monday morning.

I-75

·         Three northbound lanes will close between Cumberland Boulevard and SR 280/Delk Road from 5 a.m., until 7 p.m., Saturday for sign structure work.

·         Three northbound lanes and one southbound lane will close between SR 280/Delk Road and SR 120 Loop/ South Marietta Parkway from 5 a.m., until 7 p.m., Sunday for sign structure work.

·         The I-75 northbound off-ramp to SR 120 Loop/ South Marietta parkway will close from 6 a.m., until 10 a.m., Sunday.

·         Traffic pacing will take place on the I-75 northbound ramp from Central Avenue. The traffic pace will take place while external contractors demolish a building. The traffic pace will require motorists to drive 5 mph -10 mph. Traffic pacing will also take place on International Parkway and Frontage Road from 8 a.m., until 3 p.m., Saturday.

I-85

·         North of Atlanta, one lane will close on the I-85 southbound on-ramp to I-285 northbound from 9 a.m., until 3 p.m., Saturday.

I-20

·         Two westbound lanes and the shoulder will close between the I-285 interchange and Six Flags Parkway continuously from 9 p.m., Friday until 5 a.m., Monday. Contractors will also close the westbound entrance and exit ramps to SR 70/Fulton Industrial Boulevard and Six Flags Parkway. The westbound ramp closures will take place nightly from 11 p.m., and 6 a.m. on Friday night and Saturday night.

·         One eastbound lane will close between SR 70/Fulton Industrial Boulevard and the I-285 interchange and two eastbound lanes will close between the I-285 interchange and SR 139/Martin Luther King Jr. Drive continuously from 9 p.m., Friday until 5 a.m., Monday.

I-285

·         Up to two westbound lanes will close between Chamblee Tucker Road and SR 13/Buford Highway from 9 p.m., Friday until 5 a.m., Monday.

·         On the eastside perimeter, a section of the on-ramp from I-285 westbound to I-85 northbound will close continuously from 9 p.m., Friday until 5 a.m., Monday.

·         Two northbound and two southbound lanes will close between Atlanta Road and the I-20 interchange nightly from 9 p.m., until 5 a.m., starting Friday night until Monday morning.

·         Two northbound and two southbound lanes will close just before and after Atlanta Road from 9 p.m., Friday until 5 a.m., Saturday and from 9 p.m., Saturday until 5 a.m., Sunday.

·         Three westbound lanes will close between SR 155/Flat Shoals Road and Bouldercrest Road from 9 p.m., Friday until 8 a.m., Saturday.

·         One lane will close on the I-285 eastbound collector-distributer ramp to I-75 southbound from 6 a.m., until 12 p.m., Saturday.

Georgia (State Route) 400

·         Up to three northbound and up to three southbound lanes will close between Lenox Road and SR 140/Holcomb Bridge Road nightly from 9 p.m., until 5 a.m., starting Friday night until Monday morning.

·         One northbound lane will close between SR 141/Peachtree Parkway and MacFarland Parkway continuously from 9 p.m., Friday until 12 p.m., Monday.

·         Two northbound and two southbound lanes will close just before and after Encore Parkway from 9 p.m., Friday until 5 a.m., Saturday.

Other State Routes

·         On SR 42/Moreland Avenue, one northbound and one southbound lane will close between the I-285 interchange and Key Road for deep patching from 8 p.m., Friday until 8 a.m., Saturday and from 8 p.m., Sunday until 5 a.m., Monday.

·         On SR 141/Peachtree Industrial Boulevard, one northbound and one southbound lane will close between North Shallowford Road and Club Drive from 8 p.m., Friday until 8 a.m., Saturday and from 8 p.m., Sunday until 5 a.m., Monday.

·         On SR 120/ Old Milton Parkway, one eastbound and one westbound lane will close between the Georgia (State Route) 400 interchange and Brookhollow Trail from 8 p.m., Friday until 8 a.m., Saturday.